American Tug & Barge supports bridge retrofit, seismic retrofit, and new construction. On San Francisco Bay, ATB has been on every bridge project in the last 30 years, in transportation and on-site work. Work also includes the Columbia River and Puget Sound bridges. The same service covers the Los Angeles and Long Beach bridges. Contractors use ATB for material moves, pile and pier work, and access.
Jobs are quoted from the bridge and the term. Deck barges, spud barges, crane barges, and Flexi-Floats are used on the work. Truckable tugs and workboats are used where a harbor tug cannot reach the span. A tug and barge can be sent as a package, or the tug can work the contractor’s barge.
Work
- Seismic retrofit support
- Bridge retrofit and rehabilitation
- New bridge construction support
- Material and equipment transport
- Barge placement and shifting
- Crane barge support
- Pile and pier support
- Bridge fendering support
- Snooper truck rental
- Specialized barge and man-lift access
- Containment and painting platforms
- Crew and workboat runs
San Francisco Bay
- San Francisco–Oakland Bay Bridge
- Golden Gate Bridge
- San Mateo–Hayward Bridge
- Dumbarton Bridge
- Richmond–San Rafael Bridge
- Carquinez Bridge
- Benicia–Martinez Bridge
- Antioch Bridge
Los Angeles / Long Beach
- Vincent Thomas Bridge
- Long Beach International Gateway (Gerald Desmond replacement)
- Commodore Schuyler F. Heim Bridge


